Industrial Pipe & Drainage — Est. 2009

PIPE THROUGHACTIVE FLOORS.

Cutting, welding, and routing drainage while forklifts keep moving and production never stops.

We'll tell you if we can have a crew there today

Scroll to see what we fix
Licensed & Bonded — IL / IN / WI24/7 Emergency DispatchIAPMO CertifiedFood-Grade & Pharma Ready2-Hour Emergency Response
Fault Analysis — Active Site Failures

Three calls we get
at 2 a.m.

FAULT-01

Burst Main / Loading Dock Flood

📍 Zone D — Receiving Bay

A 4-inch cast iron main fails at 2:14 a.m. Six inches of standing water across 8,000 sq ft of receiving floor. Three shifts halted. Every hour costs $40K in lost throughput.

CRITICAL — ACTIVE FLOOD

Estimated throughput loss: $40K/hr

FAILED: 4" CI MAIN — ELBOW JOINT
200'-0" MAIN RUN4" Ø CI MAINJOINT FAILUREFFL +0'-0"
FAULT-02

Grease Trap Backflow into Clean Room

📍 Zone A — Processing Suite 3

FOG accumulation in an undersized interceptor reverses flow during peak production. Contaminated effluent enters the clean room floor drain. FDA notification mandatory within 24 hours.

REGULATORY — FDA NOTIFICATION REQUIRED

Compliance clock: T+24hr from discovery

FAILED: GREASE INTERCEPTOR — UNDERSIZED
CLEAN ROOM BOUNDARYFLOOR DRAINFOG FULL!CAPACITYEXCEEDEDUNDERSIZED: 750 GAL / REQ: 1500 GAL
FAULT-03

Failed Backflow Preventer — Compliance Shutdown

📍 Zone B — Process Water Tie-In

Annual test reveals a failed RPZ assembly. The water authority issues a shut-off notice. No process water means no production. The facility has 48 hours to replace and re-certify.

SHUTDOWN NOTICE — 48HR COMPLIANCE WINDOW

Water authority ref: WA-2026-0847

FAILED: RPZ ASSEMBLY — RELIEF VALVE SEAT
CITY SUPPLYOPENNO FLOW — PROCESS WATERRPZ FAILEDSEAT WORN1" RPZ ASSEMBLYSHUT-OFFNOTICE48 HRS
Same diagram. Different outcome.
Remediation — Engineered Solutions

Same drawing.
Fixed system.

SOL-01 — REMEDIATED
FLOOR DRY — FFL +0'-0"4" Ø SCH-40 PVC — NEWREPAIRED200'-0" MAIN RUN — SCH-40
Burst Main → Loading Dock

Emergency Re-Pipe with Isolation Valve Array

New Schedule 40 PVC main with redundant isolation valves at 40-foot intervals. Automated shutoffs tied to flow sensors. Future failure isolated in under 90 seconds — no floor flooding.

4" SCH-40 PVC replacement
Zone isolation valves @ 40' OC
Flow sensor integration
Completed in one 8-hr shutdown window
SYSTEM RESTORED — FLOOR DRY

Next failure isolated in < 90 sec

SOL-02 — REMEDIATED
TRENCH DRAIN — 1/4" SLOPECHECK40% — NORMALSAMPLE1,500 GAL INTERCEPTOR — NEW
Grease Trap → Clean Room

Properly Graded Trench Drain + Sized Interceptor

Correctly-sized 1,500-gallon interceptor with in-line sampling port. Trench drains graded at 1/4" per foot to the interceptor. Backflow check valve at clean room boundary. FDA-compliant.

1,500 gal interceptor (PDI-G101)
Trench drain @ 1/4" per ft grade
Stainless check valve — clean room
Sampling port for FOG testing
FDA COMPLIANT — CLEAN ROOM PROTECTED

Interceptor sized per PDI-G101 standard

SOL-03 — REMEDIATED
CITY SUPPLYCLOSEDPARALLEL BYPASS — REDUNDANTSTANDBYTEST PORTPROCESS WATERCERTIFIEDWA-2026SAME DAY
Failed RPZ → Shutdown

RPZ Replacement + Redundant Assembly

New Watts 009 RPZ with parallel redundant assembly for zero-downtime maintenance. Annual test port with self-closing valve. Water authority re-certification completed same day.

Watts 009 1" RPZ — new
Parallel redundant assembly
Annual test port (self-closing)
Water authority re-cert: same day
WATER AUTHORITY CERTIFIED

Zero-downtime maintenance going forward

Service Architecture — Three Engagement Types

Emergency to
Design-Build.

We operate across the full scope of industrial pipe work — from a 2 a.m. dispatch call to a six-month turnkey installation. The crew that fixes your emergency is the same crew that specs your next expansion.

TIER-01AVAILABLE NOW

Emergency Response

2-Hour On-Site

Burst mains, backflow failures, compliance shutdowns. We dispatch a certified crew within 2 hours, 24/7/365. No overtime premium for nights and weekends.

24/7 dispatch — no hold music
2-hr on-site guarantee
Nights & weekends — flat rate
Temporary bypass while permanent fix is planned
Insurance documentation provided
Call Dispatch Now
TIER-02MOST REQUESTED

Scheduled Maintenance

Planned Retrofit

Backflow preventer testing, grease interceptor service, trench drain relining, and process water line extensions. Scheduled around your production calendar.

Annual RPZ testing & certification
Interceptor pumping & inspection
Trench drain relining (epoxy)
Process water tie-ins for new equipment
Maintenance log for compliance audits
Schedule Assessment
TIER-03FULL TURNKEY

Design-Build

Full System

Cold-shell to food-grade. Warehouse to pharmaceutical-ready. We read your MEP drawings, spec the system, pull permits, and install — turnkey.

MEP coordination & stamped drawings
Permit application & inspection
Food-grade & pharma-ready specifications
Cold storage & clean room drainage
Project managed by licensed PE
Get Site Assessment
Credentials & Field Record

Numbers from
the floor.

M-01
14M+

Square Feet Serviced

M-02
< 2hr

Emergency Response

M-03
340+

Active Facility Clients

M-04
17yr

Industrial Pipe Experience

Field Report
Testimonial 1/3
Called at 2:40 a.m. on a Sunday. Crew was on-site at 4:15 a.m. Floor was dry by 6 a.m. We didn't miss a shift.

Robert Haines

Facility DirectorMidwestern Cold Storage, Joliet IL

Certifications & Licenses
IAPMOInternational Association of Plumbing & Mechanical Officials
ASSE-1060Backflow Preventer Tester Certified
PDI-G101Plumbing & Drainage Institute — Grease Interceptor
NSF-61Drinking Water System Components
IL-LICIllinois Licensed Plumbing Contractor
IN-LICIndiana Licensed Plumbing Contractor
Food ProcessingCold StoragePharmaceuticalManufacturingDistributionWarehouse ConversionProcess WaterTrench DrainBackflow PreventionGrease InterceptorFood ProcessingCold StoragePharmaceuticalManufacturingDistributionWarehouse ConversionProcess WaterTrench DrainBackflow PreventionGrease Interceptor
Call Dispatch: 1-800-555-1234